![Tower Bridge approach refurbishment VGC with CVU on Tower Bridge](https://projects.vgcgroup.co.uk/wp-content/uploads/2017/05/VGC_TowerBridge.jpg)
| CVU |
| £180,000 |
| Tower Bridge Road, London |
| Nov 2016 |
| Dec 2016 |
![Upper Clapton road footway replacement Upper Clapton Rd](https://projects.vgcgroup.co.uk/wp-content/uploads/2016/05/UpperClaptonRd-CVU-jv.jpg)
| CVU joint venture |
| £130,000 |
| London E5 |
| Feb 2016 |
| Mar 2016 |
![Modular emergency refuge area modular ERA trial slab](https://projects.vgcgroup.co.uk/wp-content/uploads/2018/08/Modular-ERA-trial-slab.jpg)
| Balfour Beatty Vinci JV |
| £82,000 |
| Moreton-in-Marsh, Gloucestershire |
| Apr 2017 |
| Jun 2017 |
![M3 underground ducting and cabling M3 cabling project](https://projects.vgcgroup.co.uk/wp-content/uploads/2021/01/DSC_0093-web-2006.jpg)
| Jackson Civil Engineering |
| £3.5 million |
| M3 motorway |
| Nov 2006 |
| Nov 2007 |