![Thames Valley park and ride retaining wall being built](https://projects.vgcgroup.co.uk/wp-content/uploads/2019/11/TV-park-and-ride-retaining-wall.jpg)
| Balfour Beatty Living Places |
| Earley, Reading |
| Feb 2019 |
| Aug 2020 |
![Sixteen Crossrail projects VGC staff at Crossrail Whitechapel](https://projects.vgcgroup.co.uk/wp-content/uploads/2015/12/DSC5216-web.jpg)
| Costain, Skanska, Geoffrey Osborne, Balfour Beatty, Morgan, Vinci, BAM, Ferrovial, Kier, Alstom, TSO, Keltbray |
| ongoing |
| London |
| Apr 2012 |
| Dec 2020 |
![Rail recovery – Clipstone and Denby scrap rail recovery](https://projects.vgcgroup.co.uk/wp-content/uploads/2021/01/scrap-rail-recovery.jpg)
| Network Rail |
| £141,000 |
| Nottinghamshire |
| Jun 2011 |
| Jul 2011 |
![Raised GRP walkway Stepney Green Park GRP raised walkway](https://projects.vgcgroup.co.uk/wp-content/uploads/2018/11/GRP-raised-walkway.jpg)
| Alstom Costain JV |
| £65,000 |
| Tower Hamlets, London |
| Jul 2018 |
| Aug 2018 |
![Signalling equipment room at Farringdon VGC worker at the Farringdon signalling equipment room](https://projects.vgcgroup.co.uk/wp-content/uploads/2020/07/Farringdon-SER.jpg)
| London Underground |
| £900,000 |
| Farringdon station, London |
| Apr 2016 |
| Jan 2017 |
![Modular emergency refuge area modular ERA trial slab](https://projects.vgcgroup.co.uk/wp-content/uploads/2018/08/Modular-ERA-trial-slab.jpg)
| Balfour Beatty Vinci JV |
| £82,000 |
| Moreton-in-Marsh, Gloucestershire |
| Apr 2017 |
| Jun 2017 |
![Power Road Studios Power Road Studios site](https://projects.vgcgroup.co.uk/wp-content/uploads/2017/12/PowerRdStudio-site.jpg)
| Blackburn & Co, Helical Plc |
| £405,000 |
| Chiswick, W4, London |
| Aug 2017 |
| Nov 2017 |